Free guide for estimators
Cladding Takeoff Field Guide
Aluminium, fibre cement and Colorbond in 13 pages: what to measure, how to convert it, and what sits behind the sheet.
- Aluminium, fibre cement and Colorbond tables — sizes, covers, weights, fixings
- How to measure each system: sheets, lengths, blanks and battens
- Five worked examples, quantities only
- Maker's top hat or generic? The one-question rule
- What fibre cement is made of, and which come prefinished
- Checks before you price, and 40 links to the official install guides

Get the PDF
Free. We email you the odd estimating tip — unsubscribe any time.
Thanks — the guide is opening.
If it didn't open, download it here.
General information only, current to November 2026. Products, sizes, spans and certificates change — always check the current manufacturer install guide, the project specification, the NCC and your engineer. Brand names identify products only; Subino has no affiliation with, and is not endorsed by, any maker named.