For facade & cladding subcontractors
Job software for facade and cladding subbies.
Where Subino started. Everything every subbie gets, plus the two things a cladding business needs: panel drawings and factory stock.
Updated
Sound familiar?
You've got the software. And the spreadsheet beside it.
Most subbies run an Excel template alongside their software to cover the gap. Subino is built for subbies, so there's no spreadsheet on the side.
Rates per square metre in a workbook
The cladding rates, waste and access live in a template, and every estimate starts as a copy of the last one.
Panel sketches as photos in a text thread
The site sketches the panel, sends a photo, and the office redraws it in CAD and rings to check what that number says.
Stock on a clipboard
What's in the yard and which job used it is tracked on paper, so the material cost never reaches the job.
One system
What facade & cladding subbies get
From the tender to the last claim. Enter it once.
Cladding panel drawings
Photograph the crew's sketch, AI reads the written dimensions, the crew confirm, and the office gets a CNC-ready DXF.
Factory stock
Issue material to a job from your phone, and the cost goes with it.
The cost sheet
Rates under your own cost codes with waste, preliminaries and markup, and an alternative priced beside the scope.
The estimate is the budget
Win it and the budget is already there, against the same cost codes.
Progress claims with retention
Claim against the priced scopes, with the split a builder expects.
Questions
Straight answers
Who built Subino?
A facade estimator, inside a working facade and cladding business in Australia. That's why panel drawings and factory stock are in it. The rest is built for how any subbie works.
Does it do the takeoff?
Keep Bluebeam for measuring. Subino holds the quantities against the scope they belong to, inside the revision you priced.
Another trade? See every trade or everything in Subino.
See Subino on a job of your own
Fifteen minutes. Bring a real job from your trade and we'll price, budget and claim it with you.
No obligation, no card — fifteen minutes on a job of your own.