Skip to content

Download

Subino Drawings for Windows

Open the job’s PDFs from your own Jobs folder, measure lengths, areas and counts, and send the quantities to the Cost Sheet. Sign in uses your Subino login.

Download for Windows

Version 0.1.17 · released 16 November 2026 · about 15 MB

Windows 10 and 11, 64-bit · Signed by Subino Pty Ltd

Subino Drawings runs on Windows PCs

On a Mac or a phone, use Subino in your browser — your jobs, the Cost Sheet and proposals are all there.

Version 0.1.17 · Windows 10 and 11, 64-bit · about 15 MB

No account? Start the 14-day free trial — no card.

Updated

The Subino Cost Sheet the quantities go to: cost-coded line items with rates per square metre, raw cost, gross and quoted totals
Measured in Subino Drawings, priced on the job’s Cost Sheet in Subino.

Install

Up and measuring in three steps

  1. Download and open the installer

    Open Subino-Drawings-setup.exe from your Downloads. It installs for your own Windows account, with no admin prompt.

  2. Sign in with your Subino login

    The same email and password you use on app.subino.com.au. Your company's jobs come with it.

  3. Point it at your Jobs folder

    On your PC, OneDrive or Google Drive. Add your jobs from the folder names in one go, then open a drawing and set the scale.

System requirements

Windows
Windows 11, or Windows 10 version 1803 (April 2018 Update) or later
Processor
64-bit (x64)
Download
About 15 MB
Screen
At least 1024 × 640
Admin rights
Not needed — it installs for your own Windows account
Microsoft Edge WebView2
Already part of Windows 10 and 11; the installer adds it if it is missing
Internet
To sign in, send quantities and get updates
Account
Your Subino login — or a free trial

How updates work

The app checks for a new version when it starts and every few hours. A new version downloads quietly in the background, then a bar offers Restart or Later. Settings shows your version and a Check now button.

Subino Drawings is on every Subino plan, from Estimating at $200 a month for up to 2 office users. See what each plan includes.

For IT administrators

Silent installs and updates

Two installers, both signed by Subino Pty Ltd: setup.exe per user, and an MSI per machine.

Per user — setup.exe

Subino-Drawings-setup.exe /S

Installs silently for the signed-in user, into their own AppData folder. No admin rights. Keeps itself up to date.

Download setup.exe

Per machine — MSI

msiexec /i Subino-Drawings.msi /qn

For Intune, Configuration Manager or Group Policy, and for computers where AppLocker or WDAC only allows programs from Program Files.

An MSI copy does not update itself: when a new version comes out, deploy the newer MSI. The app tells people on a managed copy that their IT team handles updates.

Download the MSI
  • Signed by Subino Pty Ltd — allow it by publisher if you keep an allow-list.
  • Connect to Claude listens on this computer only (127.0.0.1), so Windows Firewall does not ask.

Release notes

What's new

Version 0.1.2 ·

  • Recent tools have two modes: Properties mode draws a new shape with the same settings; Drawing mode places an exact copy of the shape — click to repeat it
  • Group markups (Ctrl+G) so they select, move and copy as one
  • Flip horizontal or vertical (Ctrl+Alt+H / V) — a group flips as one piece
  • Align markups left, centre, right, top, middle or bottom

Version 0.1.1 ·

  • First MSI for IT teams — install per machine through Intune, Configuration Manager or Group Policy
  • The top bar stays the same inside a job, so the Pipeline is one click away
  • Estimator avatars are readable in dark mode
  • The app name shows once, in the title bar

Version 0.1.0 ·

  • First public release, signed by Subino Pty Ltd
  • Open the job's PDFs from your own Jobs folder — on the PC, OneDrive or Google Drive
  • Set the scale and measure lengths, areas and counts
  • Markups saved into the PDF itself; quantities sent to the job's Cost Sheet
  • Connect Claude Desktop on your own Claude plan to read the drawings and draft scope items for you to check
  • Updates itself: a new version downloads quietly and asks you to restart

FAQ

Questions about the app

Is there a Mac or phone version?

Not of Subino Drawings — it is Windows only for now. On a Mac or a phone, sign in to Subino in your browser at app.subino.com.au; your jobs, the Cost Sheet and proposals are all there.

Where are my drawings stored?

In your own Jobs folder — on the PC, or a OneDrive or Google Drive folder — one folder per job. The PDFs never leave your drive. Markups are saved into the PDF itself and also kept in your Subino account, so the quantities reach the Cost Sheet and your team.

Does it work offline?

You need the internet to sign in the first time. After that, if the connection drops you can keep measuring: the Offline badge shows how many changes are waiting, and they go up to Subino when you are back online. Sending to the Cost Sheet and anything with AI need a connection.

How do updates work?

The app checks for a new version when it starts and every few hours. A new version downloads quietly in the background, then a bar offers Restart or Later. Settings shows your version and a Check now button. Copies your IT team installed from the MSI are updated by IT instead.

Do I need a Subino account?

Yes — Subino Drawings signs in with your normal Subino login, and it is on every Subino plan. No account yet? Start the 14-day free trial: no card, and the download link comes with it.

How do I uninstall it?

In Windows Settings, open Apps (Installed apps on Windows 11, Apps & features on Windows 10), find Subino Drawings and choose Uninstall. Your Jobs folder and its drawings stay where they are, and your markups stay in your Subino account.

No account? Start the 14-day free trial

Try Subino Drawings free for 14 days — no card, and the download link comes with it.