How to estimate ACM (aluminium composite panel) cladding

Reza7 min read

To estimate ACM cladding, find your finish codes on the elevations, read each one in the finish schedule, check the wall types, then find those walls on the setout plans. Take lengths from the floor plans and heights from the sections. List every scope item, price each on your own rates, and apply waste and margin once.

Draft.This article hasn’t had its final edit yet, so treat anything specific in it as provisional.

Frequently asked questions

What waste allowance should I use for ACM panels?

Use your own figure from past jobs. Waste on ACM depends on the panel layout, the sheet sizes your supplier offers, the folded returns and how many panels are one-offs, so a number from someone else's job tells you little. Record what you actually used on each job, and apply waste once across the lot, not inside every measurement.

Can I measure ACM cladding from the elevations?

Not on their own. The elevations tell you where each finish code is, but they hide setbacks, leave out walls behind other parts of the building and show angled walls shorter than they are. Take the lengths from the floor plans or wall setouts and the heights from the sections, and use the elevations as a final check.

What should an ACM cladding estimate include?

At least the subframe and top hats, panel fabrication including folded returns, the joints and reveals, flashings, corners, penetrations, fixings, access and hire, and whatever fire performance evidence the specification asks for. Each one should be its own line, priced on your own rates, so you can show what you allowed for.

Do I need to check fire requirements for ACM cladding?

Yes. Check the specification and NCC requirements for the project, and price whatever evidence and documentation the specification asks you to provide for the panel. This article doesn't give compliance advice. If the documents are unclear or disagree, raise it as an RFI to the builder before the tender closes.

How do I price labour for ACM cladding?

On your own rates and your own figures from past jobs. Break the labour into the work it covers, such as subframe, panel installation, flashings and sealing, and price each against its own measurement. A figure you can trace back to a finished job is worth more than any rule of thumb.