Skip to content

All articles

Best software for facade and cladding subcontractors in Australia (2026)

Reza6 min read

There is no single best software for a facade or cladding subcontractor, because the tools do different jobs. Takeoff tools measure drawings, builder platforms run a builder's project, trade job apps suit service work, facade software designs and fabricates systems, and estimating and job-cost systems run the money. Many subbies combine a takeoff tool with one job-cost system.

Draft.This article hasn’t had its final edit yet, so treat anything specific in it as provisional.

Frequently asked questions

What software do cladding subcontractors use?

Usually more than one tool. A takeoff tool such as Bluebeam, Groundplan, Cubit Estimating, RIB CostX or PlanSwift measures the drawings, and an estimating and job-cost system prices the job, turns the price into a budget and runs orders, claims and variations. Fabricators of windows and curtain walls may also use facade design software such as LogiKal.

Is a takeoff tool enough to run a cladding business?

It is enough to measure, but measuring is one step. After the takeoff you still need to price on your own rates, send the proposal, turn the won price into a budget, track committed cost from purchase orders and claim progressively. Many subbies do that in a spreadsheet beside the takeoff tool, which is where double entry starts.

Should a subcontractor use builder software like Procore or Buildxact?

Builder platforms are built to run a project, and subbies often work inside a head contractor's platform on that builder's jobs. For your own business, check whether the software prices on your own rates and cost codes, turns your won price into a budget and claims against your contract, without an Excel template beside it.

Are trade job apps like Tradify or Fergus right for facade work?

They describe themselves as job management for tradies, from quote or enquiry to invoice. That suits service and smaller project work. Facade subbies quoting head contractors on larger jobs usually also need cost codes, committed cost and progress claims against a contract, so check those specifically.

Where does Subino fit?

Subino is the estimating and job-cost system in that stack, built in a facade and cladding business. It prices on your own rates and cost codes, makes the won estimate the budget, tracks committed cost from purchase orders, and runs progress claims and variations against the contract. Most subbies keep their takeoff tool beside it.

See Subino on your own numbers

Book a demo and walk through your estimating and job costing workflow with us — bring a live job and see the difference.

No obligation, no card — fifteen minutes on a job of your own.